top of page
20240319_125627395_iOS_edited.png

New era of
paver moulds

formwerk has set a milestone: concrete paver moulds that are produced in Germany in
just four weeks and offer an impressive 50% longer lifetime.
This development is a quantum leap for the industry, raising production standards to an entirely new level.

Your benefits

50%

longer lifetime

Our moulds achieve at least 50% higher cycle rates due to the use of high-quality tool steel, a patented production process and heat treatment based on vacuum technology.

4 weeks

delivery time

Thanks to our patented and automated production process, we are able to deliver mould inserts in a remarkable time of just 4 weeks. The combination of speed and quality gives our customers a significant competitive advantage.

image.png

No

repairs

Long and costly returns for repairs are not required. Thanks to the innovative vacuum heat treatment, mould cavities are all of identical size, allowing for easy on-site replacement of mould components through simple and fast screw assembly.

Our moulds for your pavers

The production process and the architecture of the new mould concept are versatile and suitable for manufacturing all types of rectangular stones, including concrete pavers, slabs, and facing bricks. Even sharp-edged stones (radius 0) can be produced using this method.

CONCRETE PAVERS

SLABS

FACING BRICKS

Modular frame-insert architecture

All moulds are based on a modular frame-insert architecture. The extremely durable frame is reused over many cycles, while the high-precision inserts can be replaced as needed, enhancing value for our customers. The insert is screwed into the frame and can be easily replaced by the customers themselves.

image_edited.png
image_edited.jpg

Images above: mould inserts are securely screwed into a robust frame. Due to the screw connection, the
mould inserts can be simple and fast replaced on-site.

Easy assembly

The high precision of all components ensures a perfectly coordinated interaction of the various mould parts. The shoes are pre-centered with a special foil upon delivery of the mould, reducing assembly time with the load to 1-2 hours.

image.png
bottom of page